Case 1:

Cold Chain Warehouse in Almaty, Kazakhstan (Special for Extreme Cold Climate)

Project Background:To meet the demand for cold chain logistics in Central Asia, a large cold storage warehouse capable of withstanding temperatures as low as -40°C was built, with a total construction area of approximately 8,000 square meters.

Satisfied customer giving thumbs up in front of cold storage steel structure warehouse in Almaty Kazakhstan built by Guohuan Steel with loading dock and refrigerated truck
Structural Solution
Installation Highlights

Customer Value
The structure has been operating stably for more than 3 years, with maintenance costs reduced by 25% compared with traditional steel structures, and is fully adaptable to extreme cold climates.

Case 2:

Sihanoukville Cross-border E-commerce Warehouse in Cambodia (High Load + Logistics Adaptation)

Project Background: To build a 15,000㎡ three-dimensional warehouse plant for Southeast Asian cross-border e-commerce, which needs to meet the requirements of high-level shelves and forklift passage.

Structural Solution
Installation Highlights

Customer Value
After the warehouse is put into operation, the daily order processing volume of a single warehouse has increased to 20,000 orders, becoming a regional core e-commerce hub.

Cross-border e-commerce steel structure warehouse in Sihanoukville Cambodia with container loading dock sorting conveyor system and logistics distribution center
Case 3:

Renovation of a Used Steel Factory Building in Nur-Sultan, Kazakhstan (Budget Priority + Environmental Protection)

Project Background: A start-up company with a limited budget needs to quickly build a 5,000㎡ light processing factory building.

Used steel structure factory renovation project in Nur Sultan Kazakhstan with workers installing equipment budget-friendly and eco-friendly building solution
Structural Solution
Installation Highlights

Customer Value
Rapid production with low cost, reducing the financial pressure for start-ups, and practicing the concept of green manufacturing.

Case 4:

Automobile Parts Production Workshop in Phnom Penh, Cambodia (Tropical Climate + Rapid Delivery)

Project Background: With the rise of Cambodia’s automobile industry, the client needed to complete a 12,000㎡ modern production workshop within 6 months.

Structural Solution
Installation Highlights

Customer Value
Put into production 1 month in advance; after production capacity is released, annual revenue increases by more than 40%; the structure has excellent anti-corrosion performance.